LDN1

LDN1

A proven, scalable data centre campus in a strategic London location

Connectivity

Power and scalability

East and West Halls

Available for immediate fit-out, offering contiguous multi-MW capacity — one of the few such opportunities in the UK market.

Designed for enterprise flexibility

Rack density, cooling technology, lease structures and SLAs — all tailored to your requirements.

Future campus (2032+)

Planned expansion to deliver up to 60 MVA of power capacity, supporting the next generation of digital infrastructure.

Operational excellence

LDN1 specification

Site overview

Location

Camberley, West London edge (<1 ms latency to all key London hubs); 51 ° 20’ 0.2” 0° 45’ 58.1” W 5

Land area

5.4 acres freehold campus

Gross internal area

145, 585 sq ft (13,525 sq m)

Critical white space

40,000 sq ft

Design standard

Tier 3 equivalent, concurrently maintainable, enterprise-grade

Current tenancy

2.5 MW leased to tier 1 financial institution

Performance & scalability

Uptime design

99.98% availability, concurrently maintainable across all major systems

Available capacity

Up to 22 MW in LDN1 New East and West Halls (configurable to rack density requirements GB300 NVIDIA reference design)

2032+ campus

60 MVA

White space

Hall format

Powered shell, suites or cages

Rack voltage

230/400v, 415/240v, 48v DC or 380v DC on request

Containment

Hot/cold aisle, RDHx/D2C options on request

Cooling (configurable)

Density

East/West Hall: up to 200 kw/rack DLC – configurable to tenant rack architecture (GB300, B300, B200 NVL72, lower-density mixed)

Plant

Dual chilled-water loops, economiser chillers, modular pumps, and pathways for plate HX/CDUs for liquid

Control & PUE

BMS integrated, target <1.2 liquid

Connectivity

Meet-me-rooms

Dual MMRs providing diverse carrier entry; expandable for additional tenants/halls

Latency

<1 ms round trip to London Docklands, Slough and City hubs

Fibre network

Dense regional fibre with onward connections to major cloud on -ramps and IXPs

Power infrastructure

Utility feeds

2 x 11 kV (Main Building), 2x11kV New East Hall) / Gas supply with 6.5MW+ onsite baseload generation (SOFC)

UPS topology

Static or rotary; Li-ion or VRLA. Distributed architectures to match tenant specification

Generators

N+1 at side load, with material headroom, HVO-ready, dual bulk tanks w/48hr autonomy at full load, on-site load banking

Power quality & metering

ISO-metered A/B, optional rack level metering

Distribution to rack

Dual-path A/B via overhead busway or customer-specified A/B power whips (overhead/underfloor). Metered tap-offs or PDU feeds available. Designed for air or liquid-cooled high-density racks

Security & monitoring

Access control

24×7 staffed security, dual gate and dual-mantrap entry, perimeter fencing

CCTV coverage

Full internal and external surveillance including data halls, entrances, and perimeter

Fire detection & suppression

VESDA early smoke detection; Inergen/IG-55 inert gas suppression in halls and plant rooms

Monitoring systems

Trend BMS for HVAC control and performance optimisation; E-TEC SCADA system for M&E plant, switchgear monitoring

Building site & features

Floor system (configurable)

Structural slab-on-grade (configurable with raised floor as necessary)

Roof

Kalzip double-pitch, acoustic treatments; maintenance access

Loading & logistics

Dedicated staging areas, truck dock, secure delivery bay

Office & ancillary space

Fixed office, control room, storage, mezzanine; additional build-outs available on request

SITES 2 AND 3 COMING SOON